Dec 13, 2017 Leave a message

Ball valve installation and maintenance methods

Ball valve installation:

1, must confirm that the pipeline and valve have been cleaned before operation.

2, the valve actuator operation according to the size of the input signal stem rotation completed: forward rotation 1/4 turn (900), the valve is turned off. The valve opens when rotated 1/4 turn (900) in the reverse direction.

3, when the direction of the implementing agency arrow parallel with the pipeline, the valve opens; arrow and pipeline vertical, the valve closed.

Ball valve repair:

Longer service life and maintenance-free time will depend on several factors: Maintaining a harmonious temperature / pressure ratio under normal operating conditions, together with sound corrosion data.

note:Ball valve in the closed state, the body of the fluid pressure remains.

Before servicing, remove the line pressure and place the valve in the open position;Before servicing, disconnect the power or air supply;Before maintenance, the actuator and the bracket from.

1, packing lock.If the filler culvert in the leakage of leakage, to be locked stem nut.Note: Do not lock, usually to lock 1/4 ring to 1 ring, the leak will stop.

2, replace the seat and seal.

A.disassembly.

Let the valve in a half-open position, flushing dangerous substances inside and outside the valve may exist.Close the ball valve, remove the flange bolts and nuts on both sides, and remove the valve completely from the pipe.Disassemble the drive unit in sequence - actuator, connecting bracket, lock washer, stem nut, butterfly shrapnel, gland, wear plate, stem packing.Remove the cover connection bolts and nuts, the cover removed from the valve body, and the cover gasket removed.Make sure the ball is "off" position, which makes it easier to take it out of the body and remove the seat.Push the valve stem down through the hole in the body until it is completely removed, then remove the O-ring and packing ring.

Caution: Exercise caution to avoid scratching the packing seal on the stem surface and valve.

B.reassemble.

Cleaning and checking parts of the parts under investigation, it is highly recommended to replace the seat and bonnet gaskets and seals with replacement parts kits.Instead, assemble according to the disassembly order.Cross the flange bolts with the specified torque.With the specified torque, lock the nut.After the actuator is installed, the spool rotates the corresponding input signal by rotating the valve stem to open and close the valve.If possible, seal the pressure test and the performance test of the valve according to the standard after installing the pipe.

Send Inquiry

Home

Phone

E-mail

Inquiry